Clients

INDUSTRY PROJECT DETAILS RESULTS ACHIEVED
HVAC&R
Honeywell 5-facilities in Bangalore & Chennai

2000 -2002, Repeat jobs.

Shankar Nethralaya, Chennai. Manipal Hospital, Bangalore. Three Taj group of hotels. Implementation of HVAC and air-conditioning performance energy savings contracts.
HTMS
Tripoli city and suburbs, Libya thro' Secon

2008

Libya at Tripoly city ring road Design and development consultancy for HTMS for 23km ring road for city traffic congestion reduction
Hotel
The Residence Belle Mare, Mauritius

2010 at The Residence Belle Mare Mauritius Hotel.

163 rooms Luxury Leisure hotel with 295,000sqf area, 4floors (1B+1G+2) and 0.87mw maximum demand 5% Energy Savings verified at NO-COST implementation
Hotel
Taj West End Hotel Bangalore

1997 -2004, Repeat jobs.

Screw Chiller efficiency test. BMS efficacy testing. Energy and total power management. Harmonic distortion correction.
Hotel
Taj Samudra Colombo, Sri Lanka

2005

320 Rooms, 494,000SQF built-up area, 500tr centrifugal air conditioning system and 1.9mw maximum demand. Energy and total power management
Hotel
Taj Vivanta Hotel Bangalore

1997 -2006, Repeat purchase order from Taj Vivanta Hotel Bangalore.

167 rooms 178,600SQF built-up area, 0.80mw maximum demand. 7% Energy Savings verified at NO-COST implementation. Efficiency testing for screw chiller. BMS testing. Installed Harmonic Filter. Solved tripping of centrifugal chiller on grid voltage fluctuations.
Hotel
Taj Group of Hotels 10-hotels across India

1997 -2007, Repeat jobs.

Enhancing hotels energy efficiency Energy and total power management
Hotel
Taj Gateway Hotel Bangalore

1997-2004, Repeat jobs.

Third party test Screw chillers efficiency test. BMS efficacy test. 9% Energy Savings verified at NO-COST implementation
Hotel
Taj Exotica Bentota, Sri Lanka

2005

162 Rooms, 220,000SQF built-up, area 2x200tr Centrifugal chillers, 0.8mw maximum demand at 70% occupancy Energy and total power management
Hotel
Taj Airport Garden Negombo, Sri Lanka

2005

120 Rooms. 86,700SQF built-up area, 180TR Reciprocating chiller, 0.50mw maximum demand at 80% occupancy Energy and total power management
Hotel
Oberoi Hotel Bangalore

2004

Trouble-shooting UPS cards, Computer SMPS and Monitor Failures Eliminated reported failures by implementing recommended solutions.
Hotel
Mercure Homestead Residences, Accor Hotels, Bangalore

2010

Air cooled air conditioning system installed. 126 rooms, each between 400 -854 sft size, 125,000sqf built-up area including inc.12% park&M. 6% Energy Savings verified at NO-COST implementation