Clients

INDUSTRY PROJECT DETAILS RESULTS ACHIEVED
Hotel
Sheraton ITC Hotel, Bangalore

1997

Hospital energy conservation Energy and total power management
Hotel
Sheraton Brigade, Bangalore

2012

230 rooms, 600,000 SQF built-up area (incl.33% park and maintenance). 20-Floors (3B+1G+1M-5th+15). 1.4mw maximum demand. 6% Energy Savings verified at NO-COST implementation.
Hotel
Leela Palace, Bangalore

2013

357 Rooms, 950,000SQF built up area, 3.1mva maximum demands, 11-Floors (3B+1L+1M+6). Power quality and harmonic analysis carried out and report with recommendations submitted.
Hotel
IBIS Hotel, Pune

2011

162 Rooms of about 150sqf size. 116000SQF built-up, 10 floors (2B+1G+7), 0.34mw Demand 8% energy savings verified at NO COST implementation.
Hotel
IBIS Hotel, Gurgaon

2010

217 Rooms with Daikin VRV Air conditioning system. Built up area 140,600sqf, 0.63mw demand at 74% occupancy 6% Energy Savings verified at NO-COST implementation
Hotel
Hyatt Park, Hyderabad

2013

242 rooms and 42 serviced apartments with 800,000 SQF built-up area including 37% card park and maintenance area. 13-Floors (5B+1G+0-M+7). 2.0MW maximum demand. 8% energy savings verified at NO COST. Troubleshooting frequent puncturing of condenser tubes with 2sets of 700TR Centrifugal Chillers with VFD Drives.
Hotel
Holiday Inn, Chennai

2013

209 rooms green field project with 200000SQF built-up area Optimum project design and design audit
Hotel
Ginger Hotel, Pune

2007

100 Rooms, each 190 to 230 Sq,ft. size. Built up area 35000 SQF built-up, MD 0.13mw with average 73% occupancy Energy and total power management
Hospital
Vikram Hospital, Bangalore

2010 -2015 

24/7 Electromechanical operations and maintenance O&M
Hospital
Mallya hospital, Bangalore

1996

Hospital energy conservation Energy and total power management
Hospital
Apollo hospital, Hyderabad

1999

Hospital energy accounting and solving energy sub metering errors Energy and total power management
Hardware
APC by Schneider Electric

2003 -2004 Repeat Purchase Orders from APC by Schneider Electric in Bangalore at Unit-I and Unit-II.

UPS manufacturing units Conducted Energy Audit and Electrical safety audit for the facilities.