Clients

INDUSTRY PROJECT DETAILS RESULTS ACHIEVED
Automobile
Ashok Leyland Limited, Plant-II

2002. Hosur, Ashok Leyland Limited, Plant-II at Hosur, Tamilnadu.

Automobiles, Bus, Truck & LCV manufacturing plant was facing Seam welding equipment malfunction of bad welding quality due to excess deposit along the line of the welding. Problem occurred after installation of variable frequency drives at various sections of the plant. Supplied one 1300A Tuned harmonic filter at the main transformer LT PCC supplying the welding machine section and solved the problem.
Airport
Bharat Petroleum Corporation Ltd throu' L&T

1997 at New Delhi International Airport, Job done for BPCL through L&T, Larsen & Toubro.

Aircraft ATF fuelling division. Trouble shooting analysis and provided solution for the ATF pump tripping problem during aircraft fueling at desired pressure
Aeronautics
Hindustan Aeronautics Limited, engine division

2012. Hindustan Aeronautics Limited engine division. To solve drive card failure with Helicopter Engine Manufacturing Process

Helicopter engine division for improving power quality and suppressing harmonics Supplied Harmonic Filter to solve voltage sag (fluctuation) related tripping and eliminate power quality harmonics failure for its sensitive electronics equipment.
Aeronautics
Hindustan Aeronautics Limited, space avionics

1999- 2004, Repeat jobs. Hindustan Aeronautics Limited space avionics. Solved DG Synchronization problem.

Avionics equipment manufacturer for defense sector. Problems with incoming power supply at 2x 15mva transformer of 66kv/11kv substation and sets of 2mw, 11kv diesel generator's supply. Solved Synchronization rejection problem with sets of 2mw, 11kv DGs.