Encon Harmonic Solution is an inveterate canon of erudition that's evolved from 500+ projects of 350+ clients worldwide by solving harmonic failure problem. Thanks to your unstinted support since our inception in 1995 and…
Clients
INDUSTRY | PROJECT DETAILS | RESULTS ACHIEVED |
---|---|---|
HVAC&R Honeywell 5-facilities in Bangalore & Chennai 2000 -2002, Repeat jobs. |
Shankar Nethralaya, Chennai. Manipal Hospital, Bangalore. Three Taj group of hotels. | Implementation of HVAC and air-conditioning performance energy savings contracts. |
HTMS Tripoli city and suburbs, Libya thro' Secon 2008 |
Libya at Tripoly city ring road | Design and development consultancy for HTMS for 23km ring road for city traffic congestion reduction |
Hotel The Residence Belle Mare, Mauritius 2010 at The Residence Belle Mare Mauritius Hotel. |
163 rooms Luxury Leisure hotel with 295,000sqf area, 4floors (1B+1G+2) and 0.87mw maximum demand | 5% Energy Savings verified at NO-COST implementation |
Hotel Taj West End Hotel Bangalore 1997 -2004, Repeat jobs. |
Screw Chiller efficiency test. BMS efficacy testing. | Energy and total power management. Harmonic distortion correction. |
Hotel Taj Samudra Colombo, Sri Lanka 2005 |
320 Rooms, 494,000SQF built-up area, 500tr centrifugal air conditioning system and 1.9mw maximum demand. | Energy and total power management |
Hotel Taj Vivanta Hotel Bangalore 1997 -2006, Repeat purchase order from Taj Vivanta Hotel Bangalore. |
167 rooms 178,600SQF built-up area, 0.80mw maximum demand. | 7% Energy Savings verified at NO-COST implementation. Efficiency testing for screw chiller. BMS testing. Installed Harmonic Filter. Solved tripping of centrifugal chiller on grid voltage fluctuations. |
Hotel Taj Group of Hotels 10-hotels across India 1997 -2007, Repeat jobs. |
Enhancing hotels energy efficiency | Energy and total power management |
Hotel Taj Gateway Hotel Bangalore 1997-2004, Repeat jobs. |
Third party test Screw chillers efficiency test. BMS efficacy test. | 9% Energy Savings verified at NO-COST implementation |
Hotel Taj Exotica Bentota, Sri Lanka 2005 |
162 Rooms, 220,000SQF built-up, area 2x200tr Centrifugal chillers, 0.8mw maximum demand at 70% occupancy | Energy and total power management |
Hotel Taj Airport Garden Negombo, Sri Lanka 2005 |
120 Rooms. 86,700SQF built-up area, 180TR Reciprocating chiller, 0.50mw maximum demand at 80% occupancy | Energy and total power management |
Hotel Oberoi Hotel Bangalore 2004 |
Trouble-shooting UPS cards, Computer SMPS and Monitor Failures | Eliminated reported failures by implementing recommended solutions. |
Hotel Mercure Homestead Residences, Accor Hotels, Bangalore 2010 |
Air cooled air conditioning system installed. 126 rooms, each between 400 -854 sft size, 125,000sqf built-up area including inc.12% park&M. | 6% Energy Savings verified at NO-COST implementation |