Turbo energy Ltd, Paiyanoor

Mahabalipuram, 2013 to 2017, Repeat jobs. Faced problem with UPS active harmonic filter.

PROJECT DETAILS
Was facing CNC, UPS & chiller vfd drives electronics card failures, lighting ballast, and motor burning issues and in addition voltage sag (fluctuation) tripping for CNC m/c. Local Utility company/ TNEB mandated limiting harmonics at it 11kv.
RESULTS ACHIEVED
Installed 831A main transformer and a 88A chiller end harmonic filters, mitigated harmonics within IEEE 519 norms, and eliminated all failures.

Turbo energy Ltd, Pulivalam

Ranipet, 2013 to 2016, Repeat jobs.

PROJECT DETAILS
Was facing CNC and UPS electronics card failures, lighting ballast, and motor burning issues and in addition voltage sag (fluctuation) tripping for CNC m/c. Local Utility company/ TNEB mandated limiting harmonics at it 11kv incoming PCC.
RESULTS ACHIEVED
Installed 1011A Tuned harmonic filter, mitigated harmonics within IEEE 519 norms, and eliminated all failures. Further recommended solutions for electronic failures of Chiron high speed CNC drives during its regeneration cycle, connected at UPS output.

ABI showatech, Soorai

Kancheepuram Dist., Tamilnadu, 2013

PROJECT DETAILS
Automobile ancillary Turbo Charger manufacturer for automobiles and diesel generators of capacity 150000 turbo chargers per month. A TVS group of companies.
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted.

ABI showatech, Pulivalam

Ranipet, Tamilnadu, 2013

PROJECT DETAILS
Automobile ancillary Turbo Charger manufacturer for automobiles and diesel generators of capacity 150000 turbo chargers per month. A TVS group of companies.
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted.