Ferns Icon, Bangalore

2010, 350,000sq.ft /6flr Building

PROJECT DETAILS
Was facing submetering error. Total building energy was not matching with the sum total of tenants energy meter readings.
RESULTS ACHIEVED
Solved Sub Metering problem

Surya chamber, Multi tenanted bld

Bengalure 2004- 2009, Repeat jobs.

PROJECT DETAILS
Was facing Sub Metering problem. Building's total energy consumption was not matching with the sum of all outgoing clients energy meter readings. Facing Harmonic Distortion problem, due to which cables used to overheat and burn/puncture/blast.
RESULTS ACHIEVED
Installed 2nos Harmonic Filters. It debottle-necked DG capacity limitation eliminating tripping problem. It solved Cable failures. And solved Sub metering Error.

Interface communication, Multi tenanted bldg

Bangalore, 2004.

PROJECT DETAILS
Was facing sub metering error. Building's total energy consumption was not tallying with the sum of all outgoing tenants energy meter readings
RESULTS ACHIEVED
Solved Sub Metering Error

EID Parry India Ltd, Corporate bldg

Chennai, A 1932, 6story, 250,000Sq.Ft. heritage building. 2012- 2017. Repeat jobs.

PROJECT DETAILS
Head Office of Murugappa conglomerate that accommodates 1300 employees. Local Utility mandated harmonic limits. In-addition was facing failures with air conditioning compressor motors, transformer, Lighting ballast failure, computer cards and SMPS.
RESULTS ACHIEVED
Installed 750A and 646A tuned harmonic filters and that resolved all harmonic failures and limited harmonic distortions within CEA 2007 and IEEE 519 norms of local the utility.

Bannari Amman Chennai, Multi tenanted bldg

8200Sq.Ft. space at each floor at front 8story & back 4story. 2011 -2012

PROJECT DETAILS
Total power demand 710kw which includes fire fighting, pumps, lighting and for its occupancy which is mainly Daikin VRV chiller loads. Electrical consultancy, VRV chiller harmonics, Energy Management system.
RESULTS ACHIEVED
Electrical design and consultancy done while setting up the building with 2nos 500kva, 11kv/433v incoming power transformer, HT switch yard and designing the electrical power distribution system. Devised energy management system for tenant billing.

ACR Towers, Multi tenanted bldg

Bengaluru, 2004 - 2011, Electrical and HVAC consultancy and Design Audit. Repeat jobs.

PROJECT DETAILS
To enhance DG capacity limitation for catering to full building load. 24/7 Electro mechanical operations and maintenance, O&M services. To solve voltage fluctuation tripping with 2nos 250TR trane screw chiller. Electrical consultancy for optimum SLD.
RESULTS ACHIEVED
Installed Tuned Harmonic filter and that resolved all issues. It also resolved the chiller's frequent tripping issues. Undertook energy management study for matching energy sub metering error for appropriate billing to its tenant clients.