Data Center

Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

Robert Bosch, Bangalore

2000

PROJECT DETAILS
Data center for IT/Software and Product Development.
RESULTS ACHIEVED
3rd party testing for sets of 169TR chiller efficiency verification in IkW/TR for Data center

Qualcomm India Ltd, Bangalore

2008

PROJECT DETAILS
Data Center for CDMA/GSM telecommunication system
RESULTS ACHIEVED
Root Cause analysis for Data Center blank out problem. DG alternator failure. ATS malfunction.

Intel Bangalore

2005

PROJECT DETAILS
Product development center, IT and data center facility.
RESULTS ACHIEVED
Troubleshooting analysis for Lab utility equipment failures

HCL Technologies Ltd, Chennai

2002

PROJECT DETAILS
Software development facility's Data Center.
RESULTS ACHIEVED
Data Center's power and power quality analysis

Dell R&D, Bangalore

2007

PROJECT DETAILS
R&D Data center facility
RESULTS ACHIEVED
Data Center's power and power quality analysis