Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

EID Parry India Ltd, Corporate bldg

2012- 2017 Repeat Jobs. EID Parry is a heritage building of 1932 with 6 Story, 250,000 Sq. built up space.

PROJECT DETAILS
Head Office of Murugappa conglomerate that accommodates 1300 employees. Local Utility mandated harmonic limits. In-addition was facing failures with air conditioning compressor motors, transformer, Lighting ballast failure, computer cards and SMPS.
RESULTS ACHIEVED
Installed 750A and 646A tuned harmonic filters and that resolved all harmonic failures and limited harmonic distortions within CEA 2007 and IEEE 519 norms of local the utility.

ACR Towers, Multi tenanted bldg

2004 - 2011 repeat jobs at ACR Towers Bengaluru

PROJECT DETAILS
To enhance DG capacity limitation for catering to full building load. 24/7 Electro mechanical operations and maintenance, O&M services. To solve voltage fluctuation tripping with 2nos 250TR trane screw chiller. Electrical consultancy for optimum SLD.
RESULTS ACHIEVED
Installed Tuned Harmonic filter and that resolved all issues. It also resolved the chiller's frequent tripping issues. Undertook energy management study for matching energy sub metering error for appropriate billing to its tenant clients.