DG tripping

Aspect Development Bangalore

1999

PROJECT DETAILS
Software Development Center.
RESULTS ACHIEVED
Installed harmonic filter for troubleshooting non functioning of Air Conditioning chiller while powered through the back up DG supply.

Surya chamber, Multi tenanted bld

Bengalure 2004- 2009, Repeat jobs.

PROJECT DETAILS
Was facing Sub Metering problem. Building's total energy consumption was not matching with the sum of all outgoing clients energy meter readings. Facing Harmonic Distortion problem, due to which cables used to overheat and burn/puncture/blast.
RESULTS ACHIEVED
Installed 2nos Harmonic Filters. It debottle-necked DG capacity limitation eliminating tripping problem. It solved Cable failures. And solved Sub metering Error.

ACR Towers, Multi tenanted bldg

2004 - 2011 repeat jobs at ACR Towers Bengaluru

PROJECT DETAILS
To enhance DG capacity limitation for catering to full building load. 24/7 Electro mechanical operations and maintenance, O&M services. To solve voltage fluctuation tripping with 2nos 250TR trane screw chiller. Electrical consultancy for optimum SLD.
RESULTS ACHIEVED
Installed Tuned Harmonic filter and that resolved all issues. It also resolved the chiller's frequent tripping issues. Undertook energy management study for matching energy sub metering error for appropriate billing to its tenant clients.