Bannari Amman Sugars Ltd, Tiruvannamalai

Repeat 2011 Tamil Nadu

PROJECT DETAILS
4500tcd crushing capacity green field cane sugar plant with co-generation power plant and grid synchronizing transformer. Supplied 4nos 930A, 690V Tuned Harmonic Filters across 2nos 3.15mva, 11kv/690v - 690v converter transformers.
RESULTS ACHIEVED
Each converter transformer connected to a sets of 750kw dc mill motors (through a doublet converters) and a 225kw GRPF dc motor. Green field project objectives were 10% Energy savings, Elimination of DC drives card failure and voltage sag tripping.

Bannari Amman Sugars Ltd, Nanjangud

Repeat 2010 Mysore

PROJECT DETAILS
7500tcd crushing capacity cane sugar plant with 36mw co-generation power plant with 45mva,11kv/66kv grid synchronizing transformer. Supplied 5nos 725A, 690V Tuned Harmonic Filters across 3nos 3.15mva, 11kv/690v - 690v converter transformers.
RESULTS ACHIEVED
Each converter transformer connected to 2nos 937kw dc mill motors across its two 690v secondary winding. 10% Energy savings verified. Eliminated DC drives electronic card failure and voltage sag tripping.

Bannari Amman Sugars Ltd, Sathayamangalam

Repeat 2009 -2010  Tamil Nadu

PROJECT DETAILS
4000tcd crushing capacity cane sugar plant with 20mw Turbo Generator Co-generation power plant. Supplied 4nos 790A tuned harmonic filters across three winding converter transformers 2nos, 2.5mva 11kv/433v.
RESULTS ACHIEVED
First transformer connected a 750kw DC Motor through a doublet converter and Second one to 670kw and 450kw dc mill motors across its two secondary winding. 10% Energy savings verified. Eliminated DC drives electronic card failure and voltage sag tripping.

Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

Honeywell Technologies, Bangalore

2003 -2010, Repeat jobs.

PROJECT DETAILS
Three facilities for Avionics systems, product developments and Software Development.
RESULTS ACHIEVED
Facing equipment tripping and failures. Designed and implemented Earthing Grid System for the facility's data center for solving Avionics lab's chronic electronic failures.

Firstsource facilities across India

2006 -2009 Repeat jobs

PROJECT DETAILS
Across 6 facilities across India at Mumbai, Calcutta, Chennai, Hubli and Bangalore
RESULTS ACHIEVED
Solved problems of UPS electronics card failures, Data Center tripping and UPS synchronization problem without output transformer.

The Hindu 3Presses at Hyderabad, Chennai, Meramalainagar

2004 -2006, Repeat jobs.

PROJECT DETAILS
Three printing news paper presses at Hyderabad, Chennai at Meramalainagar. To eliminate frequent tripping and electronics failures with Mitsubishi supplier fully automatic printing press systems which extensively used VFD and DC Drives,
RESULTS ACHIEVED
Supplied six sets Tuned Harmonic Filters for transformer capacity of between 1600 to 2500kva sizes. Limited harmonic distortions and resolved tripping and failure issues for electronics, motors, capacitors, Switchgear and cable overheating.

Kingfa Science & Technology (India) Limited, Pondicherry

2013- 2017, Repeat jobs.

PROJECT DETAILS
Polypropylene Compounding, 2-lines each 3.0TPH with ABB ACS 800 and Siemens Sinamics combination VFD Drives for Extruder Machine of 560kw, 400kw and 250kw capacities. (Formerly Hydro S & S Industries Ltd)
RESULTS ACHIEVED
Supplied Tuned Harmonic Filters for each PP Lines, for limiting harmonic distortions and eliminating VFD drive electronics card failures.

Kingfa Science & Technology (India) Limited, Manesar Gurgaon

2013-2017, Repeat jobs.

PROJECT DETAILS
Polypropylene Compounding, 2-lines each 1.5TPH with ABB ACS 800 and Siemens Sinamics combination VFD Drives for Extruder Machine of 580kw, and 400kw capacities. (Formerly Hydro S & S Industries Ltd)
RESULTS ACHIEVED
Supplied Tuned Harmonic Filters for each PP Lines, for limiting harmonic distortions and eliminating VFD drive electronics card failures.

Kingfa Science & Technology (India) Limited, Pune

2012- 2016, Repeat jobs.

PROJECT DETAILS
Polypropylene Compounding, 2-lines each 2.5TPH with ABB ACS 800 and Siemens Sinamics combination VFD Drives for Extruder Machine of 580kw, 400kw and 200kw capacities. (Formerly Hydro S & S Industries Ltd)
RESULTS ACHIEVED
Supplied Tuned Harmonic Filters for each PP manufacturing lines for limiting harmonic distortions and solving electrical and electronics cards failures of VFD Drives.