Energy Conservation

Bannari Amman Sugars Ltd, Tiruvannamalai

Repeat 2011 Tamil Nadu

PROJECT DETAILS
4500tcd crushing capacity green field cane sugar plant with co-generation power plant and grid synchronizing transformer. Supplied 4nos 930A, 690V Tuned Harmonic Filters across 2nos 3.15mva, 11kv/690v - 690v converter transformers.
RESULTS ACHIEVED
Each converter transformer connected to a sets of 750kw dc mill motors (through a doublet converters) and a 225kw GRPF dc motor. Green field project objectives were 10% Energy savings, Elimination of DC drives card failure and voltage sag tripping.

Coromandel Paints Nuzvid, Vijayawada

2016

PROJECT DETAILS
4,000 KL per month capacity paints manufacturing plant. An Asian Paint brand plant.
RESULTS ACHIEVED
8% Energy Savings verified at NO-COST implementation.

Honeywell 5-facilities in Bangalore & Chennai

2000 -2002, Repeat jobs.

PROJECT DETAILS
Shankar Nethralaya, Chennai. Manipal Hospital, Bangalore. Three Taj group of hotels.
RESULTS ACHIEVED
Implementation of HVAC and air-conditioning performance energy savings contracts.

Taj West End Hotel Bangalore

1997 -2004, Repeat jobs.

PROJECT DETAILS
Screw Chiller efficiency test. BMS efficacy testing.
RESULTS ACHIEVED
Energy and total power management. Harmonic distortion correction.

Taj Samudra Colombo, Sri Lanka

2005

PROJECT DETAILS
320 Rooms, 494,000SQF built-up area, 500tr centrifugal air conditioning system and 1.9mw maximum demand.
RESULTS ACHIEVED
Energy and total power management

Taj Exotica Bentota, Sri Lanka

2005

PROJECT DETAILS
162 Rooms, 220,000SQF built-up, area 2x200tr Centrifugal chillers, 0.8mw maximum demand at 70% occupancy
RESULTS ACHIEVED
Energy and total power management

Taj Airport Garden Negombo, Sri Lanka

2005

PROJECT DETAILS
120 Rooms. 86,700SQF built-up area, 180TR Reciprocating chiller, 0.50mw maximum demand at 80% occupancy
RESULTS ACHIEVED
Energy and total power management

Hyatt Park, Hyderabad

2013

PROJECT DETAILS
242 rooms and 42 serviced apartments with 800,000 SQF built-up area including 37% card park and maintenance area. 13-Floors (5B+1G+0-M+7). 2.0MW maximum demand.
RESULTS ACHIEVED
8% energy savings verified at NO COST. Troubleshooting frequent puncturing of condenser tubes with 2sets of 700TR Centrifugal Chillers with VFD Drives.