Facilities Management

Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

SAP Lab India, Bangalore

2005

PROJECT DETAILS
IT/Software development center and Data center facility.
RESULTS ACHIEVED
O&M at optimized holding cost.

Mphasis, Bangalore

2000 -2009, Repeat jobs.

PROJECT DETAILS
4-facilities at m5, m6, m7 and m10 of IT/Software development and Data Center.
RESULTS ACHIEVED
O&M at optimized holding cost. 3rd party VFD Centrifugal Chiller Efficiency Test. Facilities Design Audit.

Firstsource, Bangalore

2006 -2009, Repeat jobs.

 

PROJECT DETAILS
Three BPO facilities across Bangalore. 24/7 Electro-mechanical operations and maintenance
RESULTS ACHIEVED
O&M at optimized holding cost.

ACR Towers, Multi tenanted bldg

Bengaluru, 2004 - 2011, Electrical and HVAC consultancy and Design Audit. Repeat jobs.

PROJECT DETAILS
To enhance DG capacity limitation for catering to full building load. 24/7 Electro mechanical operations and maintenance, O&M services. To solve voltage fluctuation tripping with 2nos 250TR trane screw chiller. Electrical consultancy for optimum SLD.
RESULTS ACHIEVED
Installed Tuned Harmonic filter and that resolved all issues. It also resolved the chiller's frequent tripping issues. Undertook energy management study for matching energy sub metering error for appropriate billing to its tenant clients.