HVAC &R Efficiency Measurements

Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

Robert Bosch, Bangalore

2000

PROJECT DETAILS
Data center for IT/Software and Product Development.
RESULTS ACHIEVED
3rd party testing for sets of 169TR chiller efficiency verification in IkW/TR for Data center

Mphasis, Bangalore

2000 -2009, Repeat jobs.

PROJECT DETAILS
4-facilities at m5, m6, m7 and m10 of IT/Software development and Data Center.
RESULTS ACHIEVED
O&M at optimized holding cost. 3rd party VFD Centrifugal Chiller Efficiency Test. Facilities Design Audit.

Accenture India, Bangalore

2005, thro' IBC KP

PROJECT DETAILS
An IT BPO and Software Development Facility
RESULTS ACHIEVED
HVAC Audit and third party testing for efficiency test for high and low side HVAC System of the Building