Power quality issues

Qualcomm India Ltd, Bangalore

2008, at Qualcomm Bangalore. Solved equipment failure

PROJECT DETAILS
Data Center for CDMA/GSM telecommunication system
RESULTS ACHIEVED
Root Cause analysis for Data Center blank out problem. DG alternator failure. ATS malfunction.

Sarda Energy & Minerals Ltd. Raipur

2013- 2016 at Sarda Energy & Minerals Ltd Raipur

PROJECT DETAILS
96mw (3nos 32mw) co-generation Power Plant, 4sets 15ton 7.2mva Induction Furnaces. 5sets 9mva submerged electric arc furnaces, 250tpa sponge iron plant. 10mva, 30tph wire rod mills. 250tps pellet plant.
RESULTS ACHIEVED
Troubleshooting analysis for 3x32mw power plant tripping and blackout issues. Root cause analysis for mis-rolling in the wire rod mill at high rolling speed.

CERATIZIT India Round Tool Solutions Private Limited

2002 -2012, Repeat purchase orders at CERATIZIT India Round Tool Solutions Private Limited. Formerly G.W. Precision Tools Ltd. Bangalore.

PROJECT DETAILS
Precision Tools manufacturer. DG Alternator burnt. CNC m/c electronic failures.
RESULTS ACHIEVED
Earthing grid designed. Power system monitorting done and defects rectified.

International Tech Park Bangalore

2003 at International Tech Park Bangalore. Built up area 1,200,000 Square Feet.

PROJECT DETAILS
Was facing computer monitor fluctuation problem across one vertical involving several clients.
RESULTS ACHIEVED
Solved EMI problem by installing appropriate sized EMI Shield. Conducted Power Quality Study.

Hindustan Aeronautics Limited, engine division

2012. Hindustan Aeronautics Limited engine division. To solve drive card failure with Helicopter Engine Manufacturing Process

PROJECT DETAILS
Helicopter engine division for improving power quality and suppressing harmonics
RESULTS ACHIEVED
Supplied Harmonic Filter to solve voltage sag (fluctuation) related tripping and eliminate power quality harmonics failure for its sensitive electronics equipment.

Hindustan Aeronautics Limited, space avionics

1999- 2004, Repeat jobs. Hindustan Aeronautics Limited space avionics. Solved DG Synchronization problem.

PROJECT DETAILS
Avionics equipment manufacturer for defense sector. Problems with incoming power supply at 2x 15mva transformer of 66kv/11kv substation and sets of 2mw, 11kv diesel generator's supply.
RESULTS ACHIEVED
Solved Synchronization rejection problem with sets of 2mw, 11kv DGs.