Sub metering error

The Energy Research Institute, Bangalore

1998-1999, Repeat Jobs.

PROJECT DETAILS
A R&D Institute for Energy Conservation and Power Management.
RESULTS ACHIEVED
On behalf conducted troubleshooting, Power Quality and Harmonic Analysis studies at JK White Cements, Gotan, Rajasthan. Supplied Power Quality Analyser.

Apollo hospital, Hyderabad

1999

PROJECT DETAILS
Hospital energy accounting and solving energy sub metering errors
RESULTS ACHIEVED
Energy and total power management

Ferns Icon, Bangalore

2010, 350,000sq.ft /6flr Building

PROJECT DETAILS
Was facing submetering error. Total building energy was not matching with the sum total of tenants energy meter readings.
RESULTS ACHIEVED
Solved Sub Metering problem

Surya chamber, Multi tenanted bld

Bengalure 2004- 2009, Repeat jobs.

PROJECT DETAILS
Was facing Sub Metering problem. Building's total energy consumption was not matching with the sum of all outgoing clients energy meter readings. Facing Harmonic Distortion problem, due to which cables used to overheat and burn/puncture/blast.
RESULTS ACHIEVED
Installed 2nos Harmonic Filters. It debottle-necked DG capacity limitation eliminating tripping problem. It solved Cable failures. And solved Sub metering Error.

Interface communication, Multi tenanted bldg

Bangalore, 2004.

PROJECT DETAILS
Was facing sub metering error. Building's total energy consumption was not tallying with the sum of all outgoing tenants energy meter readings
RESULTS ACHIEVED
Solved Sub Metering Error