Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

Goldman Sachs, Bangalore

2005.

PROJECT DETAILS
Financial Services facility 3rd party Testing and verification.
RESULTS ACHIEVED
Transient stability analysis with 3nos 1500KVA DG Sets.

Tata Iron & Steel Co Ltd Jamshedpur, thro' CPRI

2001

PROJECT DETAILS
Nissho Iwai, Nissin Electric Corp., and Hitachi Japan supplied 17mvar SVC System comprising of SVC Transformer of Z=51.3% Dd0-sec open thyristor controlled for reactance value control with 2HF-4.0mvar, 5HF-6.57mvar & 7HF-6.43mvar for Cold Roll Mill (CRM).
RESULTS ACHIEVED
3rd party test, analysis & verification for PF, Flicker, Harmonic control for the SVC System with CRM load during its commissioning.

Ispat Industries Ltd, Dolvi Maharashtra

2001 -2006, Repeat jobs.              

 

 

PROJECT DETAILS
Electric Arc Furnace 2x 180 Ton, 150mva, 33kv/ 1120v transformer, 2x 2000A SF6 CB with Siemens, Germany make 2x 190mvar SVC with TCR, 50mvar 2HF, 30mvar 3HF, 30mvar 4HF, and 70mvar 5HF. Main I/C 4x155mva, 220/33kV, Ynynd1-tertiary for resistive earthing.
RESULTS ACHIEVED
Root cause analysis for chronic SVC reactors and capacitor failures. Upstream 5000TPM Blast Furnace and SIP and Downstream Hot rolled mill and DRI sponge iron plant. 3rd party testing.

Taj Vivanta Hotel Bangalore

1997 -2006

PROJECT DETAILS
167 rooms 178,600SQF built-up area, 0.80mw maximum demand.
RESULTS ACHIEVED
7% Energy Savings verified at NO-COST implementation. Efficiency testing for screw chiller. BMS testing. Installed Harmonic Filter. Solved tripping of centrifugal chiller on grid voltage fluctuations.

Taj Gateway Hotel Bangalore

1997-2004, Repeat jobs.

PROJECT DETAILS
Third party test Screw chillers efficiency test. BMS efficacy test.
RESULTS ACHIEVED
9% Energy Savings verified at NO-COST implementation

Triveni Engineering and Industries Ltd

1997, Udumalpet

PROJECT DETAILS
Paper industry with Co Generation power plant.
RESULTS ACHIEVED
Troubleshooting 3MW Turbine lower Load Factor and fuel efficiency due to harmonic distortions

Otis elevator company, Bangalore

2002

PROJECT DETAILS
Performance test for a 5-star hotel with and without VFD Drive
RESULTS ACHIEVED
Third party performance testing done

Bihar caustics and chemicals

1999 3rd party test of 3x 80kA Rectiformer efficiency, BHEL supply

PROJECT DETAILS
Caustic Soda and Soda Ash manufacturer. 3sets each 80kA Rectiformer with BHEL supplied HV Harmonic Filters.
RESULTS ACHIEVED
Third party Performance test conducted with the Rectiformer harmonic filters, and solutions provided.