Texas Instruments, Bangalore

2002 -2006, Repeat jobs.

PROJECT DETAILS
3-facilities at GVH, DD and CVR (with Large Data Center). Supplied 2nos Harmonic Filters to solve data center electronics and chiller motor failures and de-bottle-neck DG capacity limitation. Green Field Electrical, Air Conditioning & HVAC Design audit.
RESULTS ACHIEVED
8% Energy Savings verified with NO-COST implementation with the building's HVAC system through process optimization. 24/7 facilities management for 3-facilities in Bangalore.

Qualcomm India Ltd, Bangalore

2008

PROJECT DETAILS
Data Center for CDMA/GSM telecommunication system
RESULTS ACHIEVED
Root Cause analysis for Data Center blank out problem. DG alternator failure. ATS malfunction.

Intel Bangalore

2005

PROJECT DETAILS
Product development center, IT and data center facility.
RESULTS ACHIEVED
Troubleshooting analysis for Lab utility equipment failures

Firstsource facilities across India

2006 -2009 Repeat jobs

PROJECT DETAILS
Across 6 facilities across India at Mumbai, Calcutta, Chennai, Hubli and Bangalore
RESULTS ACHIEVED
Solved problems of UPS electronics card failures, Data Center tripping and UPS synchronization problem without output transformer.

IOCL Barauni Refienry thro' NTPC/Siemens

2007

PROJECT DETAILS
Crude Oil refinery plant.
RESULTS ACHIEVED
Troubleshooting power quality and harmonics analysis for power plant's voltage fluctuations and electrical installation issues.

Central Power Research Institute Bangalore

2001 -2005

 

PROJECT DETAILS
A R&D Research Institution - Third party testing and verification. Supplied 2sets Power quality analyzers
RESULTS ACHIEVED
On behalf conducted troubleshooting, Power Quality and Harmonic Analysis studies for Ispat Industries Limited Dolvi and Tata Iron and Steel Company Limited TISCO at Jamshedpur.

Gajanan Ferro, Jamshedpur, Jharkhand

2012, Repeat jobs. 

 

PROJECT DETAILS
Submerged electric arc furnace 6mva, 33/0.150kv for Pig Iron manufacturing. Installed 33kv, 3.8mvar tuned harmonic filter and solved 24kA bus bar failures- heating/noise/vibrations/ worn-out due to power system harmonic resonance.
RESULTS ACHIEVED
Troubleshooting electrical harmonics and resonance failures by installing 33kv passive harmonic filter

Chettinad Cement, Ariyalur

PROJECT DETAILS
2kilns each 4000TPD gray cement manufacturing with 3sets each 15mw 6.6kv Co generation power plant, coal fired
RESULTS ACHIEVED
Power quality and harmonic analysis carried out and report with recommendations submitted.

Classic Stripes Ltd., Pelhar

Mumbai, 2013- 2016, Repeat jobs.

PROJECT DETAILS
Automotive graphics screen printing decals, capacity 9million impressions per month. Facing voltage fluctuation tripping and electronic card failures on a particular day of week (Friday), due to high harmonic distortions on that day of the week.
RESULTS ACHIEVED
Troubleshooting analysis carried out and reports with recommended solutions submitted. The root cause was higher harmonic distortions coming from the utility grid on that particular day of the week, Friday.

Enhancing 3P, Power, Productivity, and Profitability; solving drive stalling and increasing sugar recovery

Abstract- A 3500TCD sugar factory installed across 3mw 415v TG four DC Mill drives each 450kw and highly fluctuating cane preparation section's slip ring induction motor loads namely 2nos 560kw Fiberizer, 225kw Leveler and 187kw Chopper. It wanted uninterrupted power export from its 6mw 11kv TG and connected across it stable linear loads of boiling and sugar houses through a set of 3.15mva and 1.5mva, 11kv/415v, Dyn11 transformers.