Bannari Amman Sugars Ltd, Nanjangud

Repeat 2010 Mysore

PROJECT DETAILS
7500tcd crushing capacity cane sugar plant with 36mw co-generation power plant with 45mva,11kv/66kv grid synchronizing transformer. Supplied 5nos 725A, 690V Tuned Harmonic Filters across 3nos 3.15mva, 11kv/690v - 690v converter transformers.
RESULTS ACHIEVED
Each converter transformer connected to 2nos 937kw dc mill motors across its two 690v secondary winding. 10% Energy savings verified. Eliminated DC drives electronic card failure and voltage sag tripping.

Deccan Herald Bangalore

2010

PROJECT DETAILS
Newspaper Printing Press
RESULTS ACHIEVED
Harmonic and troubleshooting study for root cause analysis

GE BE Ltd, Bangalore

1999 -2006

PROJECT DETAILS
Bio Medical equipment manufacturer
RESULTS ACHIEVED
Power System analysis and earthing grid sizing. Troubleshooting electrical failures